Homeowner guide
A bathroom renovation is one of the most common projects in Newmarket homes, and one of the easiest to get wrong if you rush the planning. Whether you live in an older home near the historic downtown or a newer subdivision, the same principles apply: decide what you want the room to do, understand what's behind the walls, and plan around permits, materials and timing. This guide walks you through each step.
Before thinking about tile, think about routines. Who uses this bathroom, and when? A main bathroom shared by kids needs durable surfaces, good storage and easy cleaning. An ensuite might be about a larger shower and a calmer feel. A bathroom for an aging parent may need a curbless shower, grab-bar blocking in the walls and a comfort-height toilet.
Write down three lists: what frustrates you about the current room, what you must have, and what would be nice to have. This becomes the brief for your contractor and keeps decisions focused when choices multiply.
The single biggest decision is whether fixtures stay where they are. Keeping the toilet, shower and vanity in their current locations usually keeps the project simpler, faster and more predictable. Moving them, for example turning a tub into a walk-in shower on another wall or relocating a toilet, means new drain and supply lines, sometimes changes to floor framing, and in most cases a building permit.
Neither option is wrong. A layout change can transform a cramped room. Just make the decision early, because it affects the permit, the schedule and the quote.
The Town of Newmarket issues building permits under the Ontario Building Code. As a general rule, cosmetic work and like-for-like replacements don't need a permit, while adding or altering plumbing, removing or changing walls, or creating a new bathroom generally does. The Town's Building and Renovating page is the place to confirm your situation, and the building department can answer specific questions.
Electrical work, such as new lighting circuits, heated floors or a new exhaust fan, falls under Electrical Safety Authority (ESA) rules and must be done by a Licensed Electrical Contractor. At BDF, plumbing and electrical work is completed through our licensed partner contractors, and we handle building permits when they're needed.
The parts of a bathroom that matter most are hidden once the tile goes on:
Vanities, custom glass shower doors and some tile can take weeks to arrive. The smoothest projects have major selections made and ordered before demolition starts, so the bathroom isn't out of service while you wait. A few practical tips:
Every bathroom is different, which is why an on-site visit matters more than a phone quote. The main cost drivers are:
Ask for a written, itemized quote so you can compare contractors line by line. Under Ontario's Consumer Protection Act, home renovation agreements over $50 must be in writing (see your rights when starting home renovations).
A typical bathroom renovation moves through the same phases: planning and selections, permits if needed, demolition, rough-in work (plumbing, electrical, framing), inspections where required, waterproofing and tile, fixtures and finishing, and a final walkthrough. The overall length depends on scope and lead times. Your contractor should give you a written schedule before work begins.
Not every bathroom needs a full gut. A powder room or bathroom remodel, with a new vanity, toilet, flooring, lighting and paint, can refresh a room with far less disruption.
BDF Renovation and Construction Inc. is based in Newmarket, and our team brings 15 years of renovation experience in Toronto and across Canada. We start every project with a free on-site estimate, follow up with a written, itemized quote, and back the work we perform with a 1-year warranty. See our bathroom renovation service, or read how to choose a renovation contractor in York Region.
We also serve Aurora, Richmond Hill, East Gwillimbury and Schomberg.
Replacing fixtures in the same place usually doesn't need a permit. Adding or moving plumbing, changing walls or adding a bathroom generally does. Confirm your scope with the Town of Newmarket's building department before work starts.
Size and layout changes, especially moving plumbing, plus tile area, shower type, fixture and vanity choices, and any hidden damage found behind walls or under floors.
General information only, current as of October 2026. Rules change and every property is different, so confirm requirements with your municipality before you start.
Free on-site visit
Building a Better Tomorrow
Five quick steps, about a minute. We'll reply, usually the same business day, to book your visit.