Homeowner guide
Basement apartments are one of the most practical ways to add housing in York Region: a home for a parent or adult child, or rental income that helps with the mortgage. But a unit is only "legal" if it meets provincial and municipal rules. This guide explains those rules in plain language and links to the official sources, so you can plan with confidence.
General information only, current as of October 2026. Rules change and every property is different, so confirm requirements with your municipality before you start.
Ontario calls these additional residential units (ARUs). The Town of Newmarket describes an ARU as a separate living unit within your house, including basement apartments and in-law suites. If you rent a room but share the entrance, kitchen or bathroom, that isn't an ARU (Town of Newmarket).
Through Bill 23 (the More Homes Built Faster Act, 2022), Ontario changed the Planning Act to allow, "as-of-right" (without rezoning), up to three units per lot in many existing residential areas. That can be up to three units in the main house, or two in the house and one in an ancillary building such as a garden or laneway suite (Environmental Registry of Ontario 019-5286).
"As-of-right" zoning doesn't remove the need for a permit. The province's own guide, Add a second unit in your house, says the first step is to speak with your municipal planning and building departments, and that adding a second unit requires a building permit. It also notes:
The current code is O. Reg. 163/24, the 2024 Building Code, in force since January 1, 2025. For second units it sets requirements such as fire separations between units, exits, smoke and carbon monoxide alarms, ceiling heights, windows, plumbing, heating and ventilation. Your designer and building department will confirm which requirements apply to your house.
The Fire Code (O. Reg. 213/07) includes retrofit requirements for existing two-unit houses in Part 9 (Section 9.8, "Two Unit Residential Occupancies"), covering fire separations, means of escape, alarms and electrical safety. Local fire services enforce it.
Electrical work must be done by a Licensed Electrical Contractor under an Electrical Safety Authority (ESA) permit, and inspected. You can verify a licence with the ESA Contractor Locator. Some municipalities ask for ESA documents when you register the unit.
Contact the Town of East Gwillimbury or the Township of King building department before you start. The same provincial framework applies, but zoning details, submission requirements and any registration rules are set locally.
BDF Renovation and Construction Inc. builds legal basement apartments to code, with permits handled when they're needed, and coordinates inspections. Electrical, plumbing and HVAC work is completed through our licensed partner contractors. Final approval always rests with the municipality, so we'll never promise guaranteed approval. We'll tell you honestly what we see at the free on-site estimate. Work we perform comes with a 1-year warranty.
Learn more on our legal basement apartment page. We serve Newmarket, Aurora, Richmond Hill, East Gwillimbury, Schomberg and surrounding areas. Planning the unit's kitchen and bathroom? See kitchen and bathroom renovation.
Yes, in many houses. Provincial changes made through Bill 23 allow up to three residential units on many residential lots without rezoning, but each unit still needs a building permit, must meet the Building Code and Fire Code, and may need to be registered with the municipality.
Yes. Ontario's guide says adding a second unit in your house requires a building permit from your local building department.
Several municipalities require it. Newmarket requires all additional residential units to be registered, Aurora's By-law 6660-24 requires every ARU to be registered, and Richmond Hill has its own ARU process. Check with your municipality.
Ontario's guide states that development charges are not collected for constructing a second unit in an existing house. Other fees, such as building permit and registration fees, still apply.
Free on-site visit
Building a Better Tomorrow
Five quick steps, about a minute. We'll reply, usually the same business day, to book your visit.